Strong business plan

JPS are currently engaged by ConocoPhillips Australia to apply their extensive LNG experience in an Integrated Operational Support capacity. This interdependent approach allows the APLNG asset to take advantage of JPS’s unique skill set and extensive experience for the duration of the Train 1 2021 Major Shutdown event.

JPS resources have been directly integrated into the APLNG Operations team to help de-risk and provide certainty of outcome of the scheduled scope of work. This unified outfit helps ensure the safe and timely rundown of the asset, the timely completion of the defined workscope and the safe return to service of the Train.

JPS activities include:

De-inventorying

De-inventorying

Purging/LEL Freeing

Purging/LEL Freeing

Flushing

Flushing

Isolation support (Valve line up, Verifying/Installing isolations)

Isolation support (Valve line up, Verifying/Installing isolations)

Executing Commissioning procedures

Executing Commissioning procedures

Condition monitoring

Condition monitoring

Confined Space Entry permitting and
management

Confined Space Entry permitting and management

Permit to Work (permit revalidations, PTW, Permit Authority support)

Permit to Work (permit revalidations, PTW, Permit Authority support)

Start-up support including P&ID line ups

Start-up support including P&ID line ups

Flange management

Flange management

Facility Overview

Australia Pacific LNG is a joint venture between ConocoPhillips (37.5%), Origin Energy (37.5%), and Sinopec (25%) and shipped its first LNG cargo in January 2016 after nearly five years of development and construction. Australia Pacific LNG (APLNG) is the largest producer of natural gas in eastern Australia, supplying Australian customers with natural gas and international customers with Liquefied natural gas (LNG).

Each year APLNG supplies approximately 30 percent of the east coast domestic gas market. Origin Energy operates APLNG’s gas fields, upstream exploration, production and pipeline system, while ConocoPhillips operates the downstream LNG export facility and the LNG export sales business.

"Thanks again for your whole team’s motivated and professional attitudes throughout the event, it was a pleasure working with you all."
APLNG Shutdown
Operations Coordinator

Scope of work

JPS was engaged by Chevron Australia to apply their extensive LNG experience in an Integrated Operational Support capacity. This Integrated approach allowed Chevron to take advantage of JPS’s unique skill set and extensive multi-asset experience for the duration of the Train 2 2022 Major Turnaround event, which also included Inlet and Domestic Gas Facility major maintenance.
JPS resources were directly integrated into the WSLNG Operations team to help de-risk and provide certainty of outcome for the scheduled scope of work. This integration model helped ensure the safe and timely restart of the asset, the timely completion of the defined workscope and the safe return to service of Train 2 and DomGas.

Strong business plan

There are many variations of passages of Lorem Ipsum avThere are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form by injected humour or randomised words which don’t look even slightly believable.

Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui voluptatem sequi nesciunt Proin ultrices metus idve eget sociis.

img-01
img-02
img-01

JPS activities include:

Plant shutdown and de-inventory

Plant shutdown and de-inventory

Preparation for maintenance (equipment
flushing, purging and LEL freeing

Preparation for maintenance (equipment flushing, purging and LEL freeing

Isolation of plant (valve line-up, install/verify isolations, integrity checks)

Isolation of plant (valve line-up, install/verify isolations, integrity checks)

Permit to work (issue/revalidate/close)

Permit to work (issue/revalidate/close)

Confined space entry management

Confined space entry management

Flange management

Flange management

Smith lock and car seal register
management

Smith lock and car seal register management

Completions support (permit audits, system walkdowns)

Completions support (permit audits, system walkdowns)

Return to service and start-up (P&ID line-up, oxygen-freeing, execute restart procedures)

Return to service and start-up (P&ID line-up, oxygen-freeing, execute restart procedures)

Support lessons learnt process

Support lessons learnt process

Faculty Overview

The Wheatstone LNG asset is one of Australia’s largest LNG Facilities. The onshore facility is located in the Ashburton North Strategic Industrial Area, 7.4 miles (12 km) west of Onslow in Western Australia’s Pilbara region.
The asset is made up of two liquefied natural gas (LNG) trains with a combined capacity of 8.9 million metric tons per annum and a domestic gas plant.
Chevron also owns and operates the Wheatstone Platform, the largest offshore gas-processing platform ever installed in Australia, with a topside weight of about 37,000 metric tons.